
As the key manifold equipment in the oilfield fracturing site, the high and low pressure manifold is widely used in shale gas, shale oil and large-displacement fracturing construction. Our company adopts three-dimensional modular and skid-mounted integrated design to effectively guarantee large-displacement fracturing construction, providing important equipment support and technical support for the oilfield on-site fracturing system.
Technical parameters of high pressure pipe:
Working pressure: 15000psi, 20000psi
Material class: AA, BB, CC, DD, EE (general environment, H2S environment)
Working temperature: -46 ℃ ~ + 121 ℃ (LU)
Main bore diameter: 5-1/8 ", 7-1/16"
Bypass diameter: 3-1/16 "
Applicable working conditions: high pressure and large displacement working conditions on shale oil and gas fracturing site
Technical parameters of low pressure pipe:
Working pressure: ≤ 2 MPa
Main Pipe Specification: 8 ", 10"
Side Pipe Specification: 4 " (4" FIG206)
Design features:
In order to realize large-displacement and high-pressure fracturing operations, our company adopts the integral support design of large-diameter high and low pressure manifold, and the number of interfaces can be diversified and customized. The high-pressure manifold adopts flange connection form, which is convenient to connect and enhances stability. The studded type is used as the connection device for the main and side pipes, and the side pipes are connected with the plug valves through the union flanges to form open-and-close function to the main and side paths.
24-hour service hotline0515-80680559
Email: cindy.jiang@oruid.com.cn
Website: en.oruid.com.cn
No evaluation information!